Coiled tubing installation MK 30T
Description | Characteristic |
---|---|
Installation Type | MK 30T |
Virobnitstvo | CJSC Fidmash (National Oilwell Varco (NOV) |
Dovzhina of a stub pipe | 6000 m. |
Diameter | 38.1 mm |
It has been documented that the development of oil and gas mines in Galicia began in 1810. Since 1861 mining has been conducted in an industrial way. Drilling companny Goryzonty, continues the traditions of development, conducts drilling of oil and gas wells, major repairs and provides a full range of related services and works.
Coiled tubing installation MK 30T
Description | Characteristic |
---|---|
Installation Type | MK 30T |
Virobnitstvo | CJSC Fidmash (National Oilwell Varco (NOV) |
Dovzhina of a stub pipe | 6000 m. |
Diameter | 38.1 mm |
Our equipment