Companies' group news A set of overhaul works was carried out 28.10.2022 A set of overhaul works was carried out. For GEO-NADRA-INVEST LLC, the workover of well No. 1-Grabinska has been completed. The work was completed Drilling of well No. 8-Dobrivlyany has been completed 20.09.2022 Drilling of well No. 8-Dobrivlyany has been completed for Stryjneftegaz LLC. Drilling of well No. 8-Dobrivlyany. It was started in August 2022 and completed in September 2022. The depth of the well is 1265 m. Drilling of well No. 700 Bilche-Volytska 29.07.2022 Brilliant result of the work of specialists. Drilling of well No. 700 Bilche-Volytska has been completed FOR EXPERT PETROLEUM UKRAINE LLC. The well was drilled in record time – 14 days Drilling of well No. 10-Sadzhavska has been completed 10.06.2022 For Production Sharing Agreement dated 31.12.2020 No. 7 – investor (operator) WELL CO LLC 43002645 completed drilling of well No. 10-Sadzhavska. Drilling of well No. 10-Sadzhavska was started in April 2022 and completed in June 2022. The depth of the well is 1814 m Drilling of the well to a depth of 2850 m was successfully completed 29.04.2022 Drilling of well No. 14-Tereblyanska has been completed. Drilling of well No. 14-Tereblyanska began in September 2021 and was completed in April 2022. For ECO-INVESTGROUP LLC The overhaul of well No. 8-Bystrytska has been completed 20.04.2022 For ZAKHIDNADRASERVICE LLC, the overhaul of well No. 8-Bystrytska has been completed. The work was completed Back 1 3 4 5 9 Next