Companies' group news The overhaul of well No. 8-Bystrytska has been completed 20.04.2022 For ZAKHIDNADRASERVICE LLC, the overhaul of well No. 8-Bystrytska has been completed. The work was completed Drilling of well No. 13-Bystrytska was successfully completed. 10.02.2022 Drilling of well No. 13-Bystrytska was started in January 2022 and completed The depth of the well is 1610 m. Well No. 2-Grabinska was drilled 30.11.2021 Drilling of well No. 2-Grabinska has been completed for GEO-NADRA-INVEST LLC. Drilling of well No. 2-Grabynska began in October 2021 and was completed. The depth of the well is 1560 m. Drilling of well No. 9-Bystrytska was completed 22.11.2021 Drilling of well No. 9-Bystrytska with a well depth of 1500 m was completed for ZAKHIDNADRASERVICE LLC The workover of well No. 17-Gorska has been completed 10.11.2021 For GORYZONTY LLC, the workover of well No. 17-Gorska has been completed. The work was completed A set of overhaul works was carried out 29.10.2021 For PE "NORDIC" the workover of well No. 4-Kolodnitskaya has been completed. The work was completed Back 1 3 4 5 8 Next